Things going quite well on the Grumpy Dude project, one piece ready to join the bedroom floor pile, which will make a total of five or so awaiting attention when I feel strong enough. If you could see the pile of stuff waiting to join it you would probably faint.
Started on Little Shiva and was exhausted fairly quickly due to the size and weight of the thing, but I am happy that I will be able to get it done along with the others.
Basically this stage is much heavier work and involves a lot of humphing big boxes of wool, which is why it is advisable to have several pieces to do at once so that you only have to humph the once.
Did some work on Haram Bawbag and am waiting for resin to cure and varnish to dry. The temperatures up here are so low just now that it takes twice as long as usual, so 48 hours between coats.
Apart from that, still lost in paperwork and I need to go and talk to some business people. Not sure whether they will want to supply the relevant information or whether I should adopt the suck it and see method.
I would like to meet a nice person that can manage a two way conversation and isn’t an idiot. I am really quite bored with idiots now.